Bury St Edmunds

VKE Group Bury St Edmonds construction project

Reinforced concrete frame, traditional groundworks, roads, surface and foul sewers and external works to mixed residential scheme of 135 apartments.

Burnt Oak

VKE Group Burnt Oak construction project

Construction of a 4 storey RC frame and associated groundworks, civils and hard landscaping to residential scheme of apartments. As part of the works we undertook the installation of piing mat & piling attendance, substructure RC works, crane bases, 4 storey RC frame, drainage and service installation, hard landscaping and 278 street works.

Ashton Grove

Ashton Grove architect's impression

Soft strip and structural alterations to an existing grade 2 listed school and traditional groundworks, roads, sewers and external works to 90 new build houses.  Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi […]

4-8 Russel Hill

Russel Hill development exterior view of completed build

The project consisted of the construction of two storey residential development which included the construction of reinforced concrete ground bearing slabs, reinforced concrete walls, insitu reinforced concrete stairs and reinforced concrete capping slabs.  Works also included the installation of a permanent Kingpost and pre-cast concrete ground retaining system as well as the associated groundworks, drainage, […]

101 Cleveland Street

VKE Group 101 Cleveland Street construction project

RC frames across three blocks ranging from four to ten storeys in central London. The project included a double-height podium level with drop beams, and slabs finished to falls. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud […]